Road-to-net-zero-2

Your road to sustainability

Working with Edina, we can help your business reduce energy costs and carbon emissions whilst improving energy resilience and flexibility with a hydrogen-ready Combined Heat and Power (CHP) plant, Battery Energy Storage System, or Hybrid Co-located Power Solution.

Complete your details in the form opposite and one of our experts will be in touch.

Balance Energy Affordability, Resilience, and Sustainability with our range of flexible Battery Energy Storage System (BESS), Cogeneration and Hybrid Power Solutions.

Doncaster-Power-500x325

Battery Energy Storage System (BESS)

Storing renewable or non-renewable electricity for later use offers flexibility by allowing your business to:

  • Improve the reliability, availability, and efficiency of the power supply
  • Accelerate decentralised power infrastructure which can add value to commercial and utility scale power generation models
  • High energy density and fast response time (<150ms achievable)

Discover our BESS Solution

hybrid-power-solutions-500x325

Hybrid Power Solutions

Benefit from a renewable, thermal power generation, standby generation, and energy storage technology to:

  • Reduce grid imported costs
  • Reduce carbon emissions
  • Improve operational resilience
  • Store energy for when it is needed most
  • Lower primary fuel consumption
  • Reduce plant operating hours

Discover Co-location for your project

Gateshead-CHP-Cost-Savings

Combined Heat and Power (CHP)

Cogenerate electricity and heat on-site with high-efficient hydrogen-ready CHP gas engines to:

  • Manage rising power costs
  • Reduced carbon emissions compared to conventional power production and onsite boilers
  • Enhance energy resilience
  • Reinvest cost savings in additional renewable energy technologies

Discover CHP for your business

Net Zero is not a one-technology solution, and depending on the client's requirement, a hybrid co-located solution integrating battery storage, on-site generation, and standby power offers a credible pathway to energy affordability, resilience, and sustainability.

battery storage -1-1
https://7543512.fs1.hubspotusercontent-na1.net/hubfs/7543512/Doncaster-Power-BESS-Complete.mov

Doncaster Power

Watch our recent 10MWe / 10MWh integrated battery energy storage system (BESS) solution for infrastructure developer, ForePower.

holme-bioenergy-500x325

Holme Bioenergy

Microgrid / Hybrid co-location solution delivers energy security and sustainability for UK commercial food waste management company BioteCH4.
 

Read Holme Bioenergy Case Study

Doncaster-Power-500x325-1

Doncaster Power

Edina delivers 10MW battery energy storage project for infrastructure developer ForePower.

 

Read Doncaster Power Case Study

Dynex-500x325

Dynex Semiconductors

Edina delivers Combined Heat and Power (CHP) solution for Dynex Semiconductors as part of its sustainability pathway.
 

Why Edina as your Total Solutions provider?

Tier 1 Official MWM Gas Engine distributor and BESS system integrator

>1GW installed electrical capacity

>35 years unrivalled technical expertise

Turnkey/EPC solutions contractor

Diverse product portfolio to include gas engines, standby generation, and Battery Energy Storage Systems

Customer focused - In-market project and asset-care support

Full Commissioning MWM TEM and TPEM approved access

Comprehensive Maintenance contracts to suit your requirements

24/7 365 remote asset monitoring

Extensive network of field service engineers

Rebuild facilities and access to genuine OEM spare parts

Appointed warranty provider

 

Together, Let's Power Your Future

Produce power on-site and manage your energy costs with an Edina hydrogen-ready CHP plant, store and discharge energy as part of a Battery Energy Storage System, or co-locate CHP and batteries as part of a hybrid power solution.